HVAC for hospitals and healthcare facilities

In a hospital the ventilation system is part of infection control. We design and verify the airflow, filtration and pressure relationships that protect patients and staff in operating rooms, isolation rooms, pharmacies, labs and clinics, including while the building stays open during renovations.

Corridor AHU Final filter Laminar diffuser Surgical light OR table Low return +8 Pa Positive

What makes it hard

  • CSA Z317.2 sets air change rates, filtration, humidity and pressure relationships room by room, and inspectors expect proof that each room meets them.
  • Isolation and operating rooms need pressure that holds as doors open and staff move through, with alarms that work.
  • Renovations happen inside occupied buildings, so construction dust and pressure changes must not reach patient areas.
  • Aging air handlers, steam humidifiers and controls must keep running around the clock while they are upgraded.

Codes and standards we work to

  • CSA Z317.2 Special requirements for HVAC systems in health care facilities
  • CSA Z317.13 Infection control during construction, renovation and maintenance
  • CSA Z8000 Canadian health care facilities
  • ASHRAE Standard 170 (for reference and US-designed equipment)
  • National Building Code of Canada and provincial amendments

Questions

Can you test isolation rooms while the unit is open?

Yes. We schedule room by room with your infection prevention team and test pressure, air changes and alarms with minimal disruption.

Do you work on long-term care and clinics as well as hospitals?

Yes. Long-term care homes, medical clinics, dental offices and diagnostic imaging suites all have their own ventilation needs, and we design and test them.

What do we get after testing?

A report listing each room's measured air changes, pressure and direction of airflow against the CSA Z317.2 requirement, with any deficiencies and how to fix them.

Further reading

  • Hospital HVAC and CSA Z317.2

    Learn what CSA Z317.2 covers, how it shapes hospital HVAC design and operation, how it relates to ASHRAE 170, and what owners should plan for in new and renovated facilities.

  • Operating room HVAC design

    Learn how operating room HVAC systems protect the surgical field, the design parameters set by CSA Z317.2 and ASHRAE 170, and what to verify at commissioning.

  • Isolation rooms: negative and positive pressure

    Learn the difference between airborne infection isolation and protective environment rooms, the key HVAC parameters for each, and how to verify they are working.

  • Hospital isolation room airflow control with air valves

    Learn how air valves are applied to airborne infection isolation and protective environment rooms, how to handle anterooms and mode switching, and what to verify.

  • Airborne infection control in commercial HVAC

    Learn the layered HVAC measures that reduce airborne transmission of infectious aerosols, how ASHRAE Standard 241 frames them, and how to apply them in offices, schools and other non-healthcare buildings.

  • Long-term care home HVAC

    Learn how HVAC systems in long-term care homes protect frail residents, which Canadian standards apply, and how to plan for cooling, infection control and power outages.

Talk to us about your hospital or clinic

Tell us about the building and what you need. We’ll be in touch within one hour.