1-833-888-0091contact@hvacengineering.ca

Air balancing

We measure the airflow at every diffuser, grille and fan, adjust the system until it matches the design, and give you a report that proves it.

Supply duct Pitot traverse 452 cfm Flow hood Diffuser TAB report Design 450 Measured 452 Pass ±10 %

When you need it

  • A new building or tenant fit-out is nearing turnover and the engineer needs a balance report.
  • Occupants say some rooms are too hot, too cold, stuffy or drafty.
  • Equipment, ductwork or the floor layout has changed since the system was last balanced.
  • You’re preparing for commissioning, an energy retrofit or LEED documentation.

What we do

  1. Review

    We go through the drawings, specifications, equipment submittals and control sequences, and flag anything that will stop the system reaching design before we arrive.

  2. Inspect and test

    We confirm dampers, filters, belts and controls are in working order, then measure fan performance and the airflow at every terminal with calibrated instruments.

  3. Adjust

    We set volume dampers, terminal unit minimums and maximums, fan speeds and drive settings to bring each reading within the specified tolerance.

  4. Verify and report

    We re-measure, record final readings against design, and list anything that couldn’t be corrected and why.

What you receive

  • Design and measured airflow for every terminal, fan and air handler
  • Fan data: speed, static pressure, motor current and drive settings
  • Outstanding deficiencies, with the cause and a recommended fix
  • A list of the instruments used and their calibration dates

Questions

How close to design does the airflow need to be?

The project specification sets the tolerance. For air terminals it’s commonly within ±10% of design. We report every reading against that tolerance so the engineer can see exactly where the system stands.

Can you balance a building that’s already occupied?

Yes. Most of the work happens in the ceiling space and at the diffusers. We plan it around the people using the building, and most rooms are only disturbed briefly.

Why not have the installing contractor balance the system?

An independent balance report gives the engineer and owner a check on the installation, rather than the installer grading their own work. Many specifications require the balancing agency to be independent of the mechanical contractor for that reason.