Building commissioning

Commissioning checks that a new building’s systems are designed, installed and operating the way the owner needs, and that the people running the building know how to keep them that way.

NBC NECB CSA B52 M-101 Sealed

When you need it

  • You’re building new and want proof the systems work before you accept them.
  • The project is pursuing LEED, which requires commissioning.
  • The building has complex systems, such as labs, healthcare spaces or integrated controls.
  • Past projects had problems at turnover and you want a different result.

What we do

  1. Define requirements

    We document the owner’s project requirements: how the building will be used, comfort criteria, energy goals and maintenance expectations.

  2. Review the design

    We review drawings and specifications against those requirements and flag issues while they’re still cheap to fix.

  3. Verify installation

    We check equipment as it’s installed, and review start-up and balancing results.

  4. Test functions

    We test each system through its operating modes and track every issue to resolution.

  5. Hand over

    We confirm the operations staff have the training, manuals and documentation they need, and revisit the building before the warranty ends.

What you receive

  • Owner’s project requirements and a commissioning plan
  • Design review comments
  • Functional test results and an issues log tracked to close-out
  • A final commissioning report and input to the systems manual

Questions

When should commissioning start?

In design. The cheapest problems to fix are the ones caught on paper. A commissioning agent brought in at turnover can only find problems, not prevent them.

Is commissioning worth the cost?

A Lawrence Berkeley National Laboratory study of 643 U.S. buildings found median energy savings of 13% from commissioning new construction, with a median payback of 4.2 years, before counting fewer callbacks and warranty claims.

How is commissioning different from balancing?

Balancing sets airflow and water flow. Commissioning checks the whole system, including controls, sequences, equipment and documentation, against what the owner needs. Balancing results are one input to commissioning.